Feb 10, 2017

Leaky roof, Leaky ceilings is the story after the Feb 9, 2017 snowstorm. “Over 27 garbage containers in one small area were used to collect leaking water from ceilings on the second floor, from lighting fixtures, and so on…” The Port Authority has a history of inadequate repairs, including some ceilings that have been without coverings (electric cables and pipes exposed) for over five years!

NBC-TV NY exposes PABT after snowstorm